On Monday, 30th July 2012 Math investigation was
conducted in grade6. Students were divided in groups. They had to build an
adaptation of Truss Bridge/ Cantilever Bridge. Truss Bridge was built of
newspaper and Cantilever Bridge of straws. All the materials required to build
the bridge were provided to the students. They had to build it in given
duration of time and answer a few investigative questions. Investigation was on
how strong was the bridge built and what was the maximum load can the bridge
take. Working as team, students enjoyed it and completed the challenge well
before time.
No comments:
Post a Comment